• Call 02476 612 858

    About us

    COMPANY HISTORY
    D-Kerb has been designed, manufactured and patented by Coventry based D-Drill (Master Drillers) Ltd. in response to enquiries from local authorities and City Councils searching for a cost-effective solution to installing cycle routes in their areas.
    INNOVATIVE SOLUTION
    The concept of cutting chamfers on to existing kerb stones in situ is a truly innovative solution and results in a huge reduction in the disruption associated with introducing new cycle and vehicle friendly kerbstones. It is the efficient and cost-effective solution
    TRIED AND TESTED
    This innovative new approach to re-shaping kerb stones in situ has been tried and tested on projects in the heart of the city of London for Westminster City Council and Transport for London proving both its financial and environmental benefits.
    ENVIRONMENTAL BENEFITS
    The D-Kerb process reduces CO2 emissions by more than 90%* in comparison to transporting and importing new kerb materials from China. Instead, vehicle movements are reduced, minimal waste goes to landfill, there is no requirement for imported replacement granite and disruption to pedestrian and vehicle traffic is minimized.

    *Encraft Consulting Engineers July 2014 Briefing note

    Enquiry form

    Your name (required)

    Your email address (required)

    Subject

    Message